FEATURED PROJECTS

PUBLIC HYDRAULIC WORKS

IMG_0427 DWTP RÍO VERDE (Málaga) chipiona_aerea
  • Flow: 14,400 m3/hour.
  • Purification treatment, sludge treatment through a comprehensive remodelling of the control buildings, sludge dehydration, reagents and pumping.
Conducción Bajo Andarax WWTP CHIPIONA(Cádiz).
  • Flow: 32,000 m3/day.
  • Extended Aeration Biological Treatment.
WWTP DE GRAÑÓN (La Rioja).
  • Flow: 600 m3/day.
  • Pretreatment, primary settling, low energy cost biological treatment with bacterial beds, secondary settling and sludge thickening.
BAJO ANDARAX (Almería).
  • Conduction and supply OLYMPUS DIGITAL CAMERA
WWTP CABECICOS BLANCO (Murcia). Industrial Estate.
  • Flow: 4,000 m3/day.
  • Technology: Biologic + Tertiary Treatment.
WWTP MARISMAS DEL ODIEL (Huelva).
  • Flow: 28,000 m3/day.
  • Pretreatment, adaptation of the existing physical-chemical, primary settling, biological reactor, secondary settling, tertiary treatment with ultraviolet and sludge treatment (dehydration).
WWTP EL CUERVO (Cádiz)
  • Flow: 3,150 m3/day.
  • Technology: pretreatment, biological reactor, secondary settling, disinfection with hypochlorite, sludge treatment, dehydration and deodorization.
COLLECTORS AND WWTP UBEDA(Jaen)
  • Treatment flow will be 12,696 m3/day.
  • Treatment: Roughing. Desanding – Degreasing - Biological Treatment by carousel. Secondary sedimentation. Chlorination channel. Gravity sludge thickener. Mechanical dehydration of sludge. Storage of dehydrated sludge. Deodorization of the whole plant.